• Restoration of burial site : Construction

    Restoration of burial site : Construction

  • Restoration of burial site : Chemical treatment

    Restoration of burial site : Chemical treatment

  • Restoration of burial site : Waste disposal

    Restoration of burial site : Waste disposal

  • Restoration of burial site : Restoration

    Restoration of burial site : Restoration

Ecological restoration of livestock burial site Procedures

  • 1. Expiry of excavation prohibition period

    Decision on excavation of livestock burial site

  • 2. Request accept

    Check infectious disease
    Check the amount of burying
    Check the field situation

  • 3. Contract

    Contract on ecological restoration of burial site
    Site visit

  • 4. Construction / Excavation

    Securement of driveway
    Securement of work space
    Excavation of livestock burial site

  • 5. Chemical treatment

    Alkaline hydrolysis
    Soil restoration
    Disinfection

  • 6. Complete

    Waste disposal
    Cleaning up the site

ESL-5000

Application of alkaline hydrolysis system

Eco-friendly equipment for mass livestock carcass and burial site

ESL-5000

Specification

Model name ESL-5000
Throughput Chicken 1,473 / Duck 625 / Swine 20
Capacity(mm) [2,440 X 1,027 X 1,000] X 2
Dimension(mm) 6,400 X 2,200 X 2,270
Gas oil consumption(L) 120
Processing time(hr) 5
Throughput calculation standard(kg) chicken 2.5 / Duck 5 / Swine125

* Please call for service estimate

  • Immediate action and complete sterilization in case of animal epidemic
  • Prevention of secondary pollution

Application case

[ Buje-ri, Gyeongsan ]
  • Buje-ri, Gyeongsan 01. Soil compaction

    01. Soil compaction

  • Buje-ri, Gyeongsan 02. Soil flattening

    02. Soil flattening

  • Buje-ri, Gyeongsan 03. Filling up of well

    03. Filling up of well

  • Buje-ri, Gyeongsan 04. Equipment installation

    04. Equipment installation

  • Buje-ri, Gyeongsan 05. Deodorization

    05. Deodorization

  • Buje-ri, Gyeongsan 06. Excavation of burial site

    06. Excavation of burial site

  • Buje-ri, Gyeongsan 07. Carcass into the equipment and operation

    07. Carcass into the equipment and operation

  • Buje-ri, Gyeongsan 08. Feeding of alkaline chemicals into the equipment

    08. Feeding of alkaline chemicals into the equipment

  • Buje-ri, Gyeongsan 09. Treatment of waste fluid

    09. Treatment of waste fluid

  • Buje-ri, Gyeongsan 10. Restoration

    10. Restoration

  • Buje-ri, Gyeongsan 11. Disinfection of equipment

    11. Disinfection of equipment

[ Jillyang-eup, Gyeongsan ]
  • Jillyang-eup, Gyeongsan 01. Soil compaction

    01. Soil compaction

  • Jillyang-eup, Gyeongsan 02. Installation of equipment

    02. Installation of equipment

  • Jillyang-eup, Gyeongsan 03. Deodorization

    03. Deodorization

  • Jillyang-eup, Gyeongsan 04. Pumping leachate out

    04. Pumping leachate out

  • Jillyang-eup, Gyeongsan 05. Operation of equipment

    05. Operation of equipment

  • Jillyang-eup, Gyeongsan 06. Drainage

    06. Drainage

  • Jillyang-eup, Gyeongsan 07. Disassembly of FRP tank

    07. Disassembly of FRP tank

  • Jillyang-eup, Gyeongsan 08. Transfer carcass into the equipment

    08. Transfer carcass into the equipment

  • Jillyang-eup, Gyeongsan 09. Operation of equipment

    09. Operation of equipment

  • Jillyang-eup, Gyeongsan 10. Removal of FRP

    10. Removal of FRP

  • Jillyang-eup, Gyeongsan 11. Finishing work

    11. Finishing work

[ Daehyeon-ri, Gyeongju ]
  • Daehyeon-ri, Gyeongju 01. Foundation work

    01. Foundation work

  • Daehyeon-ri, Gyeongju 02. Installation of equipment

    02. Installation of equipment

  • Daehyeon-ri, Gyeongju 03. Disassembly of the upper FRP

    03. Disassembly of the upper FRP

  • Daehyeon-ri, Gyeongju 04. Deodorization

    04. Deodorization

  • Daehyeon-ri, Gyeongju 05. Transfer carcass

    05. Transfer carcass

  • Daehyeon-ri, Gyeongju 06. Carcass into the equipment

    06. Carcass into the equipment

  • Daehyeon-ri, Gyeongju 07. Feeding of alkaline chemicals into the equipment

    07. Feeding of alkaline chemicals into the equipment

  • Daehyeon-ri, Gyeongju 08. Operation of equipment

    08. Operation of equipment

  • Daehyeon-ri, Gyeongju 09. FPR Tank cleaning

    09. FPR Tank cleaning

  • Daehyeon-ri, Gyeongju 10. Restoration

    10. Restoration

  • Daehyeon-ri, Gyeongju 11. Soil compaction after restoration

    11. Soil compaction after restoration

  • Daehyeon-ri, Gyeongju 12. Complete work

    12. Complete work